GEA Process Engineering, 2016 – 2017

Guardian Glass, DeWitt, IA USA
Realization: 10/2016 – 8/2017
Characteristics of the order: Emission control system – ESP, DeSox, DeNox

More about the project:

Mechanical erection of 529t of steel structures, piping, ducts and equipment, thermal insulation.

Average number of workers: 20

Crane used: 75t, 130t