ESSROC, Italcementi Group, 2006 – 2007

Speed, Indiana, USA
Realization: 10/2006 – 05/2007
Characteristics of the order: Manufacture of equipment, transportation to the construction site and installation

More about the project:

Manufacture of the equipment, transportation to the construction site, installation of the equipment including thermal insulation of this cement production line dedusting filter with a weight of 400 tons.